| Sector | abcSecurity Services | Tender Value | N.A. | Location | Delhi - India | Ref.No | 32854642 | Closing Date | 18 - Feb - 2019 | | | Procurement of Il-series Spares - Hose, Air Strep Installation, Bushing, Bolt, Washer, Deflector Inner Wing, Section No. 1 of Airbrake Flap (rh), Nlg Strut Charging Cover, Link Pipe, Bolt, Spring Strat, T-connection, T-connection, Elbow, Elbow, Tee, T-connection Ke26, T-connection Ga140, Elbow Ga142, Elbow Ga140, T-connection Ke26, Link Rod(limit Switch 19), Branch Pipe, Pipe Durite No.04 Engine, Handle (t-1), Handle (t/r), Handle (hp Shut Down), Handle (hp Shut Down), Handle (hp Shut Down), Handle (hp Shut Down), Handle (t Lock), Discharge Pipe, Rear Cover, Box 036, Close( Green Annunciator), Relay Box 46, Plate, Insulator, Plate, Signal Light Arrangement of Main U/c, Seat Belt Pilots with Shoulder Straps, Washer, Branch Pipe Orb Shutter, Pipe, Turnbuckle, Tee Lh, Branch Pipe, Branch Pipe (lh), Branch Pipe, T Joint (right), T Joint Left, T-joint (right), T-joint (left), Branch Pipe, Branch Pipe (rh), Branch Pipe, Branch Pipe, Bracket (rh), Bracket (lh), Branch Pipe, Beam, Pipe, Pipe, Gang of Shut of Valve 2236t with Pipe, Hook-spring, Strop (rip Cord Installation), Plate Cover, Coupling Wire (telpher Lever), Housing Toilet, Lid Sink Tube, Coller (nlg Steering Zero Indicator), Cover, Stab Selection Switch, on Green Annuncaitor, Nut (installation of Rollar Track Attachment Locks on Cargo and Ramp), Strop (rip Cord Installation), Bracket Lh (telepher Assy Lock Installation of Electric Monorail Motor Hoist), Rollar, Bracket Lh (lock Assembly Installation of Electric Monorail Motor Hoist), Movable Dynameter Unit, Rod (unit Installation of Extractor Parachute System), Bracket Right (telepher Assembly), Loom-3, Tab Trim, Airborn (lh), Slat Door Control Pylon No.2 (rh), Hinge (loop), Housing (rh), Housing (lh), Upper Panel (right), Upper Panel(right), Upper Panel (left), Upper Panel (right), Upper Panel (right), Upper Panel (right), Upper Panel (left), Upper Panel (right), Upper Panel (left), Upper Panel (right), Upper Panel (left), Bell Crank, Bolt, Bracket Right (telepher Assembly), Rear Upper Wing Panel, Pipeline(near Ga142), Pipeline (below Nlg Ga163), Pipeline, Side Door Pipeline, Bushing, Connection Through Nlg Snubber, Elbow Ns51a, T-connection Ga142, Pipe Line, Pipeline (from Kg-11 on Ramp), Bolt, Bolt, Screw, Turnbuckle, Bolt, Connection Ns51a, Connection Ke26, Elbow Ga142, Pipe, Block, Jumper, Nut, Block, Block, Block, Cork, Nut, Arku2 Control Panel, Pipeline (near Ns51a Rh), Pipeline (from Oil Cooler to Ns51a Lh Side), Pipe Line, Pipeline (connecting to Bungee Cylinder), Pipeline (connecting to Bungee Cylinder), Pipe Line, Pipe Line, Pipe Line, Pipeline, Pipeline, Hydraulic Pipe Line, Pipeline, Pipeline, Pipe Line, Pipeline, Pipeline, Pipeline, Pipeline, Open Amber Anuncator, Trigger Switch (outer Matallic Portion), Hydraulic Pipeline, Hydraulic Pipeline, Coupling, Sealing Ring, Coupling, Pin, Shim ~ . |
|
|