Product Detail :
|
Empanelling of architects for bamul projects for the period of five years
|
Tender Detail : |
Empanelling of architects for bamul projects for the period of five years scope of work and other information: 1. preparation of preliminary drawings, consisting of master plans, site plan, plan of the buildings, elevation, sections, for works/buildings. the architects shall prepare a maximum of three alternative proposals for the construction of the building along with preliminary estimates. this includes preparation of block levels showing and adjacent buildings, roads, surface, drainage, sewer and water lines, trees, overhead electric lines and underground cables, drains and other necessary details including the site investigation results. 2. preparation of detailed estimates for the project for the selected master plan as per current schedule rates of karnataka public works department, bangalore / karnataka power transmission corporation ltd; bangalore and for items not found in the current schedule of rate of required to be included shall be done only after approval by the bamul. the estimation shall also cover internal electrification, water supply and sanitary facilities and external services, landscape, interiors, furniture, telephone cables, networking, connectivity and any other facilities that the bamul may desire to be provided. 3. preparation of tender document with detailed specifications including conditions of contract. 4. scrutiny of tenders opened by the engineer-in-charge, bamul and preparation of comparative statement and recommendations to the bamul. 5. a] preparation of detailed working and specifications viz., internal and external water supply, roads, sanitary, electrical, drainage, substation etc., for the approved master plan. electrical sub station: b] preparation of detailed wiring drawings and specifications viz., internet facilities; networking, telephone etc., 6. preparation of: a] detailed structural designs [shall be designed to withstand seismic forces and wind forces]. the design shall be proof checked by the agencies approved by bamul. if necessary redesign based on comments of bamul. b] working structural drawings. c] architectural drawings. - 7. the architects shall certify the executed quantity comparison with the tendered quantity. a] with regard to certification of the quality of the work, the architects will certify the architectural finish with reference to drawings. b] the architects shall make periodic visits to the site during the construction of the buildings and advise the engineer-in-charge regarding the implementation of their plans and designs. c] preparation of revised estimates based on the tender rates and data rates as the case may be, for the work, when the work is in an advanced stage of construction [when approximately two thirds of the work is over] to get a clear financial picture. d] after the completion of work, prepare and supply. i] final drawing with plans, elevations, sections, structural details, structural designs etc., incorporating all the changes made during the execution of the work. 8. any other details as required during the execution of work. |