Product Detail :
|
Multi village water supply scheme in villages, through design, build, operate and transfer mode under jal jeevan mission. Part – a design, build, testing and commissioning a. head works including intake well, connecting pipeline, inspection chamber, jack-well, foot bridge and pump house, (B) raw water pumping main up to water treatment plant, (c) water treatment plant and associated buildings/ facilities, (d) treated water storage tank and pumping station with pumping machinery, (e) treated water pumping mains/ feeder mains bulk water transmission mains/ bulk gravity mains from wtp to mbr/ bpt ipss/ zbts, (e) construction of master balancing reservoirs, zonal balancing reservoirs (G) intermediate pumping stations lifting stations along with sumps, (h) zbts for supplying treated water to habitations (I) installation of bulk water meters at all points in the water supply system to measure the water produced and supplied, (j) installation of required appurtenance to ensure the equitably water supply at all outets, (k) electromechanical works, (l) instrumentation and control, automation, operation management system (scada) etc.
|