Product Detail :
|
Formation of industrial layout including Formation of 60m wide road, 30m wide, 24m wide roads with flexible pavement, construction of RCC side drains, RCC Box culverts, RCC utility ducts, RCC Retaining wall, HDPE dual water Supply pipe lines, UGD pipeline netWork, construction of ICCC Building etc., at sector-1 of phase-2 of Dharwad Industrial node at Dharwad Talk and District.
|