Product Detail :
|
Proposed civil works for the provision of lift - 1no. at PF No. 9 and 10 for FOB at BNC end of KSR Bengaluru station. SW-II Proposed civil works for the provision of lift - 1no. at PF No. 5 and 6 for FOB at BNC end of KSR Bengaluru station. SW-III Provision of lift to FOB connecting Metro Sky walk on back side of KSR Bengaluru station. SW-IV KSR Bengaluru - Mysore section Proposed constructions of track men rest room/tool room. - 7nos. in ADEN/MYA section - Balance work. Maintenance period is 3months.
|
Tender Detail : |
Ksr Bengaluru: Sw-i: Proposed Civil Works for the Provision of Lift - 1no. at Pf No. 9 and 10 for Fob at Bnc End of Ksr Bengaluru Station. Sw-ii: Proposed Civil Works for the Provision of Lift - 1no. at Pf No. 5 and 6 for Fob at Bnc End of Ksr Bengaluru Station. Sw-iii: Provision of Lift to Fob Connecting Metro Sky Walk on Back Side of Ksr Bengaluru Station. Sw-iv: Ksr Bengaluru - Mysore Section: Proposed Constructions of Track Men Rest Room/tool Room. - 7nos. in Aden/mya Section - Balance Work. Maintenance Period is 3months. |